The container is discharged on a Tuesday, devanned on Wednesday, and on Thursday someone notices a third of the pallets are a shade off. By then three clocks are already running against three different parties, and none of them started when you noticed. They started when the goods were handed over.
L&Q GLOBAL is a building-materials procurement office in Foshan, China, working with importers and distributors on factory selection, independent QC and consolidated loading. This is the part of the job that begins after the vessel sails, where most importers learn too late that a claim is not an argument. It is a file.
Every serious tile order gets a pre-shipment inspection. An inspector samples each production lot and judges it against an agreed acceptance quality limit, using the sample sizes and switching rules of ISO 2859-1, the AQL standard now in its third edition (January 2026). It answers one question precisely: did this lot conform when it was packed?
It cannot answer Thursday's question: are these the goods that were packed, and did they survive the voyage? A sample drawn in Foshan says nothing about container sweat in week three, a dropped pallet at transhipment, or a pallet count that was wrong at loading. The two are halves of one chain.
Where buyer and seller sit in different Contracting States, international sales are governed by default by the UN Convention on Contracts for the International Sale of Goods. China has been a Contracting State since 1 January 1988, and the Convention applies directly to a China-to-overseas sale unless the contract excludes it.
Article 38 requires the buyer to examine the goods within as short a period as is practicable, and expressly allows examination to be deferred until after arrival where the contract involves carriage. That is the legal basis for inspecting at your warehouse rather than the factory gate.
Article 39 is the one that ends claims. The buyer loses the right to rely on a lack of conformity if notice specifying its nature is not given within a reasonable time after discovery. The outer limit is two years from the date the goods were actually handed over, unless a contractual guarantee period is inconsistent with it. Article 40 closes the door the other way: a seller who knew, or could not have been unaware, and said nothing, cannot rely on either article.
The practical sting: the Convention never defines reasonable time in days. For tiles it collapses fast, because tile evidence is destroyed by use. Once cartons are opened and pallets broken for installation, you can no longer show that a warped edge or a shade shift arrived with the goods rather than appearing in your own store. A claim strong in week one is arguable in week six and worthless in month six, not because two years expired but because the evidence did.
Under Article 36(1) the seller is liable for a lack of conformity that existed when risk passed, even if it appears later. The principle is easy; proving which side of the ship it happened on is not.
Claims against the shipping line run on a different statute. Under Article III rule 6 of the Hague-Visby Rules, mirrored for China in Article 257 of the Maritime Code, the carrier is discharged from all liability unless suit is brought within one year of delivery, or of the date delivery should have taken place.
One year sounds generous. It is not: the duty of care runs from loading to discharge, while the time bar runs wider than the duty. And a container delivered with the seal intact and the doors undamaged gives the carrier a strong position, because breakage inside an unopened box is more often stowage or packing failure than a casualty at sea.
Incoterms sharpen it. Under Incoterms 2020, FOB and CIF pass the risk of loss or damage when the goods are on board at the port of shipment. After that the goods are at your risk, which is why the insurance clock exists and why "the factory should pay" is the wrong first sentence in a transit case.
Cargo cover is described as warehouse to warehouse, which sounds like it follows the goods to your door. The wording is narrower. Under Clause 8 of the Institute Cargo Clauses 2009, cover terminates on whichever of four events occurs first, and one is the expiry of 60 days after completion of discharge from the overseas vessel at the final port of discharge. Delivery to your final warehouse, or storage at an intermediate one, ends it earlier.
Two consequences surprise buyers. A port delay, a customs query or a slow haulier can consume the cover before the goods reach you, because the clock runs from discharge. And on CIF the seller need only arrange minimum cover, Clause (C), which insures a named list of perils rather than all risks, so the policy may not respond to the loss you actually suffered.
| Clock | Against whom | Runs from | What ends it |
|---|---|---|---|
| Notice of non-conformity | The seller | Discovery, or when you ought to have discovered it | Reasonable time, with no fixed number; in practice the survival of your evidence |
| Absolute outer limit | The seller | Date the goods were actually handed over | Two years, unless a contractual guarantee period is inconsistent with it |
| Carrier liability | The shipping line | Delivery, or the date delivery should have taken place | One year, and only if suit is brought |
| Cargo insurance | The insurer | Completion of discharge at the final port | 60 days, or earlier delivery or storage election |
Most claim files fail at step one: naming the wrong party.
| What you see | Most likely cause | Who it belongs to | The proof that decides it |
|---|---|---|---|
| Shade shift between pallets, size drift, warpage, lippage | Production variation across lots or lines | Seller, as a conformity issue | Samples retained per pallet, compared under one light source, plus the approved reference sample |
| Corners crushed, cartons torn, breakage on outer rows | Handling or stowage | Carrier or insurer | Photos before devanning, seal number, container interior condition, survey report |
| Pallet count or square metres short | Loading short, or pilferage | Seller if the seal was intact; carrier if not | Tally against the packing list, seal record on the bill of lading, joint survey |
| Wet cartons, white bloom, mould on packaging | Container sweat or water ingress | Usually the insurer; carrier only if the box was not watertight | Container inspection photos, surveyor finding on the ingress point |
| Wrong size, finish or shade name | Loading error at the factory | Seller | Carton labels against the order confirmation and approved sample |
| Breakage with intact packaging and no external marks | Packing specification too weak for the route | The party that specified packing, normally the seller | The agreed packing specification, and whether the delivered packing matched it |
Damaged tiles is not a claim. It is a symptom with six possible causes, and the cause selects the defendant, the clock and the evidence.
The Convention's remedies for non-conforming delivery are replacement or repair, price reduction, and damages for loss foreseeably suffered. In tile practice four outcomes cover almost every file: replacement of the affected quantity on the next run; a credit note against the next order, usually cheapest because nobody pays freight twice; re-sorting and grading at your warehouse with the seller paying the labour; and a price reduction for a small shortfall.
What rarely survives is the claim for everything downstream: lost margin, project penalties, a delayed opening. Recoverable in principle, hard in practice, because you must prove the loss was foreseeable at contracting and caused by the shortfall. Most importers do better converting a strong file into a credit note and a better packing spec.
One habit separates a credit note from an argument: settle in writing, with a debit note number. A promise to fix it on the next order is not a settlement. It is a hope with a date on it.
Installing first, claiming later. Once the material is fixed you cannot show what arrived, and the defect becomes opinion.
Signing a clean delivery receipt. It does not end a seller claim, but it nearly ends a carrier claim: the defence writes itself.
Claiming against the wrong party. Incoterms moves risk, not the quality obligation. Transit damage after loading is your risk; a production defect that existed at loading stays with the seller under Article 36(1), however late it surfaces.
Treating the 60 days as a formality. That is the clock that expires while everyone is still being reasonable with each other.
Almost every claim problem is cheaper in the contract than in the dispute.
| Clause | Weak default | What to write instead |
|---|---|---|
| Examination | Silent, so the practicable-period test applies | At buyer warehouse within 14 days of arrival, by a named surveyor |
| Notice | Reasonable time | Written notice within 7 days of discovery, samples retained 90 days |
| Shade tolerance | Silent, so every shade shift becomes a dispute | Reference sample approved in writing, stated acceptable variation, lot marking |
| Packing | Export packing | Pallet type, corner protection, stretch and strapping spec, maximum stack height |
| Insurance | CIF with Clause (C) by default | Clause (A), 110% of CIF value, with the 60-day limit noted |
| Remedy | Silent, so every claim is negotiated from scratch | Credit note for verified shortfalls; replacement for conformity failures |
| Governing law | Unclear whether the Convention applies | State it expressly: the Convention applies, or name the law and exclude it |
A claim is decided by what you can prove, and what you can prove is decided before the container sails. Inspection is booked against a defined AQL rather than a look-over, the approved reference sample is retained on both sides so a shade argument has a baseline, and loading is photographed pallet by pallet with the seal number recorded. When the container arrives, the arrival file already has something to compare against: the difference between the tiles look different and a documented non-conformity.
Our six-step sourcing process ends with the shipment, not the invoice, and the same discipline carries into mixed containers. If you are filing now and the file is thin, the next container is where the fix belongs. See what a pre-shipment inspection should cover, and the pre-sail half of this story in why a container is judged before it sails.
None of this makes a bad batch good. It makes the bad batch provable, in the only window where proving it still pays.
Notice within a reasonable time of discovery, and in any event within two years of handover, where the UN Sales Convention applies. The practical deadline is far earlier: your evidence dies when the goods are installed.
Only as a baseline. It proves the lot conformed when packed; it cannot prove the arriving goods are the packed goods, and it says nothing about five to seven weeks at sea.
The seller claim survives; the carrier claim is badly weakened. Photograph everything now, keep the pallets intact, commission a survey, and notify the insurer inside 60 days.
Whoever commissions it, in the first instance. Where non-conformity is established, the cost is part of the loss and belongs in the claim.
Usually yes for a partial shortfall: nobody pays ocean freight twice. Replacement makes more sense when a whole run is affected and the material is still needed.
If a container has arrived wrong and the file is still thin, send the packing list, the delivery receipt, the photos you have and the date of discharge. We will tell you which clock is closest to running out, and what to do this week rather than next month.
UNCITRAL, CISG text and status (Arts. 36, 38, 39, 40); Incoterms 2020 FOB / CIF, as endorsed by UNCITRAL; Maritime Code of the PRC, Art. 257; UCP 600, Art. 14(b); ISO 2859-1:2026. Clause 8 wording follows the standard Institute Cargo Clauses 2009 text; check your own policy. Commercial practice, not legal advice.